Basics Construction Scheduling

AvBert Bielefeld

E-bok
Engelska, 2017

278 kr

Läs direkt i Bokus Reader – eller ladda ned till din enhet

Fler format och utgåvor

Beskrivning

In a world of tight time frames and highly interdependent processes, scheduling is an indispensable prerequisite for successful project implementation. It is the duty of the architect to manage all the project participants in a goal-oriented manner and to call for their results when the time is right. For this reason, a systematic schedule of target dates, adapted to a project’s sequences and workflows, is a necessary tool for the day-to-day management and monitoring of complex construction projects.

Topics:

  • Organizing the planning and construction process
  • The basics of scheduling
  • Goal-oriented presentation formats and levels of detail
  • Developing a schedule
  • Using schedules in the real world

Produktinformation

Utforska kategorier

Hoppa över listan

Mer från samma författare

Andreas Achilles, Katrin Hanses, Nils Kummer, Diane Navratil, Ludwig Steiger, Bert Bielefeld - Basics Building Construction, Häftad

Basics Building Construction

Andreas Achilles, Katrin Hanses, Nils Kummer, Diane Navratil, Ludwig Steiger, Bert Bielefeld

Häftad, 2015

676 kr

Hoppa över listan

Du kanske också är intresserad av

Paula Hawkins - Den blå timmen, Pocket
  • 4 för 3

Den blå timmen

Paula Hawkins

Pocket, 2026

4,1 utav 5 stjärnor. Totalt antal röster:(9)

69 kr

Jessika Devert - Tanter på tåg, Pocket
  • Nyhet

Tanter på tåg

Jessika Devert

Pocket, 2026

5,0 utav 5 stjärnor. Totalt antal röster:(1)

99 kr

Clare Leslie Hall - När jorden brister, Pocket

När jorden brister

Clare Leslie Hall

Pocket, 2026

4,0 utav 5 stjärnor. Totalt antal röster:(53)

99 kr