Bokus
Asim Karim, Hojjat Adeli - Construction Scheduling, Cost Optimization and Management, E-bok

E-bok, Engelska, 2001

Construction Scheduling, Cost Optimization and Management

Av Asim Karim, Hojjat Adeli

1288 kr

Läs direkt i Bokus Reader – eller ladda ned till din enhet (PDF kräver ofta zoom och scroll på små skärmar).

Fler format och utgåvor

Beskrivning

Construction Scheduling, Cost Optimization and Management presents a general mathematical formula for the scheduling of construction projects. Using this formula, repetitive and non-repetitive tasks, work continuity considerations, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modelled. This book presents an entirely new approach to the construction scheduling problem. It provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization, including construction engineers, highway engineers, transportation engineers, contractors and architects. It will also be useful for researchers, and graduates on courses in construction scheduling and planning.

Produktinformation
  • Utgivningsdatum: 2001-01-25
  • Språk: Engelska
  • Filformat: PDF
  • Kopieringsskydd: LCP
  • ISBN: 9781482267686
  • Förlag: CRC Press
Utforska kategorier
Betyg & recensioner

0 recensioner

Inga recensioner tillgängliga.