Bokus

High Speed Two (HS2): Infrastructure Design and Construction – serie

Visar alla böcker i serien High Speed Two (HS2): Infrastructure Design and Construction. Handla med fri frakt och snabb leverans.

7 produkter

  1. High Speed Two - Design, Engineering and Architecture, Volume 1, Inbunden. Tillgänglighet: Lägg i varukorg

    Design, Engineering and Architecture, Volume 1

    Av High Speed Two

    Inbunden, 2021

    1194 kr

    Lägg i varukorg

    The main construction of HS2, Britain’s high-speed rail network, began in September 2020 when Main Works Civils Contractors moved from enabling works, scheme design and preparatory work to full construction of the railway. The low-carbon network will link London and the West Midlands and extend …

  2. High Speed Two - Digital Engineering, Environment and Heritage, Volume 2, Inbunden. Tillgänglighet: Lägg i varukorg

    Digital Engineering, Environment and Heritage, Volume 2

    Av High Speed Two

    Inbunden, 2021

    1115 kr

    Lägg i varukorg

    The main construction of HS2, Britain’s high-speed rail network, began in September 2020 when Main Works Civils Contractors moved from enabling works, scheme design and preparatory work to full construction of the railway. The low-carbon network will link London and the West Midlands and extend …

  3. High Speed Two - High Speed Two (HS2): Infrastructure Design and Construction - 2 volume book set (V1&2). Tillgänglighet: Lägg i varukorg

    High Speed Two (HS2): Infrastructure Design and Construction - 2 volume book set (V1&2)

    Av High Speed Two

    2021

    2312 kr

    Lägg i varukorg

    The main construction of HS2, Britain's high-speed rail network, began in September 2020. Phase One will see London to Birmingham linked by trains that can reach 225mph and Phase Two joins Birmingham with Manchester and Leeds. With Phase One consisting of 140 miles of track, 32 miles of tunnels and …

  4. High Speed Two - Design and Engineering, Volume 3, Inbunden. Tillgänglighet: Lägg i varukorg

    Design and Engineering, Volume 3

    Av High Speed Two

    Inbunden, 2023

    1144 kr

    Lägg i varukorg

    The main construction of HS2, Britain’s new zero carbon, high-speed railway, began in September 2020, when delivery activity on Phase One moved from enabling works, scheme design and preparatory work to full construction of the railway. The new railway will link London and the West Midlands and …

  5. High Speed Two - Architecture, Digital Engineering, Environment and Heritage, Volume 4, Inbunden. Tillgänglighet: Lägg i varukorg

    Architecture, Digital Engineering, Environment and Heritage, Volume 4

    Av High Speed Two

    Inbunden, 2023

    1073 kr

    Lägg i varukorg

    The main construction of HS2, Britain’s new zero carbon, high-speed railway, began in September 2020, when delivery activity on Phase One moved from enabling works, scheme design and preparatory work to full construction of the railway. The new railway will link London and the West Midlands and …

  6. High Speed Two - High Speed Two (HS2): Infrastructure Design and Construction - 2 volume book set (V3&4). Tillgänglighet: Lägg i varukorg

    High Speed Two (HS2): Infrastructure Design and Construction - 2 volume book set (V3&4)

    Av High Speed Two

    2023

    2228 kr

    Lägg i varukorg

    The main construction of HS2, Britain’s new zero carbon, high-speed railway, began in September 2020, when delivery activity on Phase One moved from enabling works, scheme design and preparatory work to full construction of the railway. The new railway will link London and the West Midlands and …

  7. High Speed Two - High Speed Two (HS2): Infrastructure Design and Construction - 4 volume book set (V1-4). Tillgänglighet: Tillfälligt slut

    High Speed Two (HS2): Infrastructure Design and Construction - 4 volume book set (V1-4)

    Av High Speed Two

    2023

    4532 kr

    Tillfälligt slut

    The main construction of HS2, Britain’s new zero carbon, high-speed railway, began in September 2020, when delivery activity on Phase One moved from enabling works, scheme design and preparatory work to full construction of the railway. The new railway will link London and the West Midlands and …