Bridge Demolition Engineering

Best Practices

AvBridge Demolition Subcommittee

Häftad, Engelska, 2024

875 kr

Beställningsvara. Skickas inom 7-10 vardagar. Fri frakt över 249 kr.

Beskrivning

Prepared by Bridge Demolition Subcommittee of the Temporary Works Committee of the Construction Institute of ASCE Bridge Demolition Engineering: Best Practices, MOP 157, provides consistent industry standards by setting minimum expectations for what should be included in a safe and effective demolition plan, indicating that a bridge coming out of service need not be held to the same design standards as a permanent structure. Topics includeManuals and specifications for bridge demolition,  Equipment and tools for bridge demolition, Loads, Demolition with explosives, andSuggested checklist of bridge demolition plans. MOP 157 intends to be a valued resource for engineers performing bridge demolition and those engineers reviewing bridge demolition analysis.

Produktinformation

Utforska kategorier

Hoppa över listan

Mer från samma serie

Hoppa över listan

Du kanske också är intresserad av

Wood Pole Structures for Electrical Transmission Lines

ASCE Task Committee on Recommended Practice for Wood Pole Structures for Electrical Transmission Lines, James M. McGuire, Otto J. Lynch, Vicki Schneider, Nelson G. Bingel, III, Jaron Todd Reay, Timothy Paul Wachholz

Häftad

1 401 kr