Beställningsvara. Skickas inom 10-15 vardagar. Fri frakt över 249 kr.
Beskrivning
In this book, the planning of assembly lines for uncertain demand is tackled and optimization algorithms are offered for the balancing of such lines. Building an assembly line is a commitment of several months or even years, it is understandable that the demand will fluctuate during the lifetime of an assembly line.
Celso Gustavo Stall Sikora is an industrial engineer and was a research assistant at the Institute for Operations Research at the University of Hamburg where he received his PhD in 2021. His work focus on optimization procedures for the design and operation of automotive production systems.
Innehållsförteckning
Introduction.- Design and operation of assembly lines.- Literature review on assembly line balancing under uncertainty.- Balancing under full sequencing control.- Balancing under no sequencing control.- Controlling production sequences using buffers.- Conclusion.