Frederic Laugier – författare
Visar alla böcker från författaren Frederic Laugier. Handla med fri frakt och snabb leverans.
10 produkter
Labyrinth and Piano Key Weirs
Av Anton J. Schleiss, Bernard Reverchon m. fl.
E-bok, 2011
1437 kr
Lägg i varukorg
Labyrinth spillways are almost as old as dam engineering. In spite of the fact that they appear as a very good technical-economical compromise, only 0.1% of large dams are equipped with such weirs. The main reason for this is that traditional labyrinth weirs usually cannot be installed on top of …
Labyrinth and Piano Key Weirs
Av Sébastien Erpicum, Frédéric Laugier m. fl.
Inbunden, 2011
3429 kr
Lägg i varukorg
Labyrinth spillways are almost as old as dam engineering. In spite of the fact that they appear as a very good technical-economical compromise, only 0.1% of large dams are equipped with such weirs. The main reason for this is that traditional labyrinth weirs usually cannot be installed on top of …
Labyrinth and Piano Key Weirs
Av Anton J. Schleiss, Bernard Reverchon m. fl.
E-bok, 2011
1437 kr
Lägg i varukorg
Labyrinth spillways are almost as old as dam engineering. In spite of the fact that they appear as a very good technical-economical compromise, only 0.1% of large dams are equipped with such weirs. The main reason for this is that traditional labyrinth weirs usually cannot be installed on top of …
Labyrinth and Piano Key Weirs II
Av Sébastien Erpicum, Frédéric Laugier m. fl.
Inbunden, 2013
2744 kr
Lägg i varukorg
Dam engineering is currently experiencing a strong revival of labyrinth oriented weirs. Labyrinth weirs, with a repetitive constructional character and an increased specific discharge capacity, are a very good technical-economical compromise. The concept of Piano Key Weir (PKW), with alveoli …
Labyrinth and Piano Key Weirs III
Proceedings of the 3rd International Workshop on Labyrinth and Piano Key Weirs (PKW 2017), February 22-24, 2017, Qui Nhon, Vietnam
Av Sébastien Erpicum, Frédéric Laugier m. fl.
Inbunden, 2017
3065 kr
Lägg i varukorg
Since the first implementation by Electricit de France on the Goulours dam (France) in 2006, the Piano Key Weir has become a more and more applied solution to increase the discharge capacity of existing spillways. In parallel, several new large dam projects have been built with such a flood control …
Labyrinth and Piano Key Weirs
Av Sébastien Erpicum, Frédéric Laugier m. fl.
Häftad, 2017
1216 kr
Lägg i varukorg
Labyrinth spillways are almost as old as dam engineering. In spite of the fact that they appear as a very good technical-economical compromise, only 0.1% of large dams are equipped with such weirs. The main reason for this is that traditional labyrinth weirs usually cannot be installed on top of …
Labyrinth and Piano Key Weirs II
Av Anton J. Schleiss, Guy-Michel Cicero m. fl.
E-bok, 2013
3065 kr
Lägg i varukorg
Dam engineering is currently experiencing a strong revival of labyrinth oriented weirs. Labyrinth weirs, with a repetitive constructional character and an increased specific discharge capacity, are a very good technical-economical compromise. The concept of Piano Key Weir (PKW), with alveoli …
Labyrinth and Piano Key Weirs II
Av Anton J. Schleiss, Guy-Michel Cicero m. fl.
E-bok, 2013
3065 kr
Lägg i varukorg
Dam engineering is currently experiencing a strong revival of labyrinth oriented weirs. Labyrinth weirs, with a repetitive constructional character and an increased specific discharge capacity, are a very good technical-economical compromise. The concept of Piano Key Weir (PKW), with alveoli …
Labyrinth and Piano Key Weirs III
Proceedings of the 3rd International Workshop on Labyrinth and Piano Key Weirs (PKW 2017), February 22-24, 2017, Qui Nhon, Vietnam
Av Michael Pfister, Michel Ho Ta Khanh m. fl.
E-bok, 2017
3636 kr
Lägg i varukorg
Since the first implementation by Electricité de France on the Goulours dam (France) in 2006, the Piano Key Weir has become a more and more applied solution to increase the discharge capacity of existing spillways. In parallel, several new large dam projects have been built with such a flood …
Labyrinth and Piano Key Weirs III
Proceedings of the 3rd International Workshop on Labyrinth and Piano Key Weirs (PKW 2017), February 22-24, 2017, Qui Nhon, Vietnam
Av Michael Pfister, Michel Ho Ta Khanh m. fl.
E-bok, 2017
3558 kr
Lägg i varukorg
Since the first implementation by Electricité de France on the Goulours dam (France) in 2006, the Piano Key Weir has become a more and more applied solution to increase the discharge capacity of existing spillways. In parallel, several new large dam projects have been built with such a flood …