Michael D. Robinson – författare
879 kr
Skickas inom 5-8 vardagar
Polarization Engineering for LCD Projection
1 662 kr
Skickas inom 5-8 vardagar
1 946 kr
Läs direkt efter köp
Using the example of LCD projection technology, this practical text provides a thorough coverage of polarization engineering problems, with appropriate solutions and mathematical tools for analysis.
Key features:
A comprehensive introduction to the basics of polarization, LCDs, projection technologies and LCD projection system engineering. A detailed examination of optical system components, including polarizers and retarder stack filters. A full treatment of system contrast and color management issues. In-depth analyses of how to manage polarization in the major LCD projection systems.Display engineers, scientists and technicians active in this field will find this a valuable resource, as will developers of large screen projection displays and microdisplays. Also useful for graduate students and researchers as an accessible introduction to the technology.
The Society for Information Display (SID) is an international society, which has the aim of encouraging the development of all aspects of the field of information display. Complementary to the aims of the society, the Wiley-SID series is intended to explain the latest developments in information display technology at a professional level. The broad scope of the series addresses all facets of information displays from technical aspects through systems and prototypes to standards and ergonomics
1 050 kr
Skickas inom 10-15 vardagar
1 091 kr
Läs direkt efter köp
When all parties involved in the construction process fully understand their roles and are able to anticipate potential points of conflict, disputes and delays will be minimised.
The Employer’s and Engineer’s Guide to the FIDIC Conditions of Contract sets out the essential administrative requirements of a FIDIC based contract by reference to the FIDIC 1999 Red Book.
The obligations and duties of the Employer and the Engineer are identified and discussed. Potential pitfalls are highlighted and likely consequences pointed out.
The importance of the Employer’s role in the preparation of tenders, which fully reflect his requirements and duties and obligations arising in the execution of the works, is emphasised. The key role of the Engineer in the effective administration of contracts after award is examined and commentary provided.
Included in the guide are a number of appendices, including model letters which will be of value to less experienced staff (particularly those whose mother-tongue is not the English language).
Engineers, quantity surveyors and project managers engaged in the contractual administration of international projects using FIDIC forms of contract will find the concise guidance in simple and jargon-free language provided here invaluable.
This, together with the author’s earlier book, Contractor’s Guide to the FIDIC Conditions of Contract - which describes the duties, rights and responsibilities of the Contractor – represents the totality of supervision, design and execution of construction projects executed under the FIDIC Conditions of Contract.
This book’s companion website offers invaluable resources to freely download, adapt and use:
Model letters for use by the Employer Model letters for use by the Contractor Sample Interim Payment Certificate Model Form for Submissions to the Engineer Model Form of Engineer’s Order for Varied Works Model Form of Daywork/Daily Record Sheets952 kr
Skickas inom 5-8 vardagar
1 091 kr
Läs direkt efter köp
When all parties involved in the construction process fully understand their roles and are able to anticipate potential points of conflict, disputes and delays will be minimised.
The Employer’s and Engineer’s Guide to the FIDIC Conditions of Contract sets out the essential administrative requirements of a FIDIC based contract by reference to the FIDIC 1999 Red Book.
The obligations and duties of the Employer and the Engineer are identified and discussed. Potential pitfalls are highlighted and likely consequences pointed out.
The importance of the Employer’s role in the preparation of tenders, which fully reflect his requirements and duties and obligations arising in the execution of the works, is emphasised. The key role of the Engineer in the effective administration of contracts after award is examined and commentary provided.
Included in the guide are a number of appendices, including model letters which will be of value to less experienced staff (particularly those whose mother-tongue is not the English language).
Engineers, quantity surveyors and project managers engaged in the contractual administration of international projects using FIDIC forms of contract will find the concise guidance in simple and jargon-free language provided here invaluable.
This, together with the author’s earlier book, Contractor’s Guide to the FIDIC Conditions of Contract - which describes the duties, rights and responsibilities of the Contractor – represents the totality of supervision, design and execution of construction projects executed under the FIDIC Conditions of Contract.
This book’s companion website offers invaluable resources to freely download, adapt and use:
Model letters for use by the Employer Model letters for use by the Contractor Sample Interim Payment Certificate Model Form for Submissions to the Engineer Model Form of Engineer’s Order for Varied Works Model Form of Daywork/Daily Record Sheets1 058 kr
Skickas inom 5-8 vardagar
1 392 kr
Läs direkt efter köp
Enables readers to easily understand the contract to enable better compliance and efficiency
Guide to the FIDIC Conditions of Contract for Construction: The Red Book 2017 helps the reader overcome some of the difficulties encountered on a typical international construction project using the FIDIC Construction Contract 2nd Edition (the 2017 Red Book), by summarizing the activities and duties of those involved, and crystallizing the requirements of the contract. To aid in reader comprehension, the text explains clauses in the sequence they appear in the contract, but also in the order they happen in real time on site. It further provides practical guidance in a concise manner, and in straightforward, jargon-free language.
It is a highly practical resource for use during the project, rather than a legal review of the contractual requirements, ensuring readers are fully conversant with the revised requirements and procedures mandated by the 2017 edition of the contract.
Guide to the FIDIC Conditions of Contract for Construction: The Red Book 2017 includes:
A review of the duties and responsibilities of the three parties, the Employer, the Engineer and the Contractor, engaged on a FIDIC-based Contract A review of the flow of documentation and instructions which is to be provided by one party to another party throughout the contract period Practical guidelines are provided for the avoidance of disputes and delays in order that contracts are completed as plannedGuide to the FIDIC Conditions of Contract for Construction: The Red Book 2017 is a practical and highly useful resource for engineers, consultants, project managers, and others who are engaged in the site management of international projects using the FIDIC Construction Contract, along with those involved in contractual administration on behalf of the client.
1 392 kr
Läs direkt efter köp
Enables readers to easily understand the contract to enable better compliance and efficiency
Guide to the FIDIC Conditions of Contract for Construction: The Red Book 2017 helps the reader overcome some of the difficulties encountered on a typical international construction project using the FIDIC Construction Contract 2nd Edition (the 2017 Red Book), by summarizing the activities and duties of those involved, and crystallizing the requirements of the contract. To aid in reader comprehension, the text explains clauses in the sequence they appear in the contract, but also in the order they happen in real time on site. It further provides practical guidance in a concise manner, and in straightforward, jargon-free language.
It is a highly practical resource for use during the project, rather than a legal review of the contractual requirements, ensuring readers are fully conversant with the revised requirements and procedures mandated by the 2017 edition of the contract.
Guide to the FIDIC Conditions of Contract for Construction: The Red Book 2017 includes:
A review of the duties and responsibilities of the three parties, the Employer, the Engineer and the Contractor, engaged on a FIDIC-based Contract A review of the flow of documentation and instructions which is to be provided by one party to another party throughout the contract period Practical guidelines are provided for the avoidance of disputes and delays in order that contracts are completed as plannedGuide to the FIDIC Conditions of Contract for Construction: The Red Book 2017 is a practical and highly useful resource for engineers, consultants, project managers, and others who are engaged in the site management of international projects using the FIDIC Construction Contract, along with those involved in contractual administration on behalf of the client.
1 019 kr
Läs direkt efter köp
The majority of FIDIC-based contracts use the Red Book (Conditions of Contract for Construction), so this book concentrates on the use of those particular forms. Supplementary comments are included in Appendix C for the Yellow Book (Plant & Design-Build) recommended for use where the contractor has a design responsibility. The Contractor is represented on site by the Contractor’s Representative who carries the overall responsibility for all the Contractor’s on-site activities. In order to provide guidance to the Contractor’s Representative and his staff, this book is divided into five sections:
A summarized general review of the Red Book from the Contractor’s perspective. A review of the activities and duties of the Contractor’s Representative in the same clause sequencing as they appear in the Red Book. A summary of these activities and duties but arranged in order of their likely time sequence on site. This has the added intention of providing the Contractor’s Representative with a means of ensuring that documents are not only properly provided to the Employer and Engineer, but most importantly that they are provided within the time limits specified in the Contract. A selection of model letters is provided which make reference to the various clauses of the contract requiring the Contractor to make submissions to the Employer or Engineer. Various appendices.The guide is not intended to be a review of the legal aspects of FIDIC- based contracts; legal advice should be obtained as and when necessary, particularly if the Contractor has little or no knowledge of the local law.
Armed on site with a copy of The Contractor and the FIDIC Contract, the Contractor’s Representative will be more able to avoid contractual problems rather than spend considerable time and energy resolving those problems once they have arisen.
1 019 kr
Läs direkt efter köp
The majority of FIDIC-based contracts use the Red Book (Conditions of Contract for Construction), so this book concentrates on the use of those particular forms. Supplementary comments are included in Appendix C for the Yellow Book (Plant & Design-Build) recommended for use where the contractor has a design responsibility. The Contractor is represented on site by the Contractor’s Representative who carries the overall responsibility for all the Contractor’s on-site activities. In order to provide guidance to the Contractor’s Representative and his staff, this book is divided into five sections:
A summarized general review of the Red Book from the Contractor’s perspective. A review of the activities and duties of the Contractor’s Representative in the same clause sequencing as they appear in the Red Book. A summary of these activities and duties but arranged in order of their likely time sequence on site. This has the added intention of providing the Contractor’s Representative with a means of ensuring that documents are not only properly provided to the Employer and Engineer, but most importantly that they are provided within the time limits specified in the Contract. A selection of model letters is provided which make reference to the various clauses of the contract requiring the Contractor to make submissions to the Employer or Engineer. Various appendices.The guide is not intended to be a review of the legal aspects of FIDIC- based contracts; legal advice should be obtained as and when necessary, particularly if the Contractor has little or no knowledge of the local law.
Armed on site with a copy of The Contractor and the FIDIC Contract, the Contractor’s Representative will be more able to avoid contractual problems rather than spend considerable time and energy resolving those problems once they have arisen.
262 kr
Skickas inom 5-8 vardagar
1 620 kr
Skickas inom 5-8 vardagar
2 043 kr
Läs direkt efter köp
1 888 kr
Läs direkt efter köp
520 kr
Läs direkt efter köp
2 337 kr
Läs direkt efter köp
451 kr
Skickas inom 10-15 vardagar
3 251 kr
Läs direkt efter köp
This empirically robust resource examines multiple ways mindfulness can be harnessed to support self-regulation, in part as a real-world component of therapy. Its authoritative coverage approaches complex mind/brain connections from neuroscience, cognitive, personality, social, clinical, and Buddhist perspectives, both within and outside traditional meditation practice. In domains such as letting go of harmful habits and addictions, dealing with depression and anxiety, regulating emotions, and training cognitive function, contributors show how mindfulness-based interventions encourage and inspire change. In addition to scientific coverage, experts translate their methods and findings on mindfulness mechanisms in terms that are accessible to students and clinicians.
Included in the Handbook:
Mindfulness and its role in overcoming automatic mental processesBurning issues in dispositional mindfulness researchSelf-compassion: what it is, what it does, and how it relates to mindfulnessMindfulness-based cognitive therapy and mood disordersMindfulness as a general ingredient of successful psychotherapyThe emperor''s clothes: a look behind the Western mindfulness mystiqueHeralding a new era of mind/brain research--and deftly explaining our enduring fascination with mindfulness in the process--the Handbook of Mindfulness and Self-Regulation will enhance the work of scholars and practitioners.
2 948 kr
Skickas inom 5-8 vardagar
992 kr
Läs direkt efter köp
748 kr
Skickas inom 5-8 vardagar
528 kr
Läs direkt efter köp
590 kr
Skickas inom 5-8 vardagar
567 kr
Skickas inom 5-8 vardagar
409 kr
Skickas inom 5-8 vardagar
3 777 kr
Skickas inom 10-15 vardagar
4 880 kr
Läs direkt efter köp
3 777 kr
Skickas inom 10-15 vardagar